IT Calculators: Network, Server & CCTV
Technical sums for networks, servers and storage, and CCTV, with the formula and standard behind every page.
27 calculators
Network · 11
- IPv4 SubnetNetwork, broadcast, host range and count, masks and binary from an IP/prefix, plus equal subnet splits.Example: Network address192.168.10.64/26Calculate →
- VLSMCarve one IP block into subnets sized to each network's host count, with no overlaps.Example: Addresses allocated244Calculate →
- IPv6 SubnetPrefix, first and last address, short and full forms, /64 count, ip6.arpa and /48 to /64 splits.Example: Prefix (compressed)2001:db8:abcd::/48Calculate →
- Tunnel MTU & MSSTunnel MTU and TCP MSS for PPPoE, GRE, IPIP, WireGuard and VXLAN, for IPv4 and IPv6.Example: Tunnel / VPN interface MTU1,432 bytesCalculate →
- Data Transfer TimeHow long a file or backup takes at a link speed, or the speed needed to finish in time.Example: Transfer time01:14:04Calculate →
- Fibre Optic Loss BudgetFibre link loss from length, connectors and splices against Tx power and Rx sensitivity, plus the longest run.Example: Total link loss10.8 dBCalculate →
- GPON / FTTH SplitterCascaded splitter loss, homes per port and the power at the ONT against the optical class.Example: Total loss21.85 dBCalculate →
- Wireless PtP LinkFree-space path loss, received signal, fade margin, Fresnel zone and Earth bulge for point-to-point links.Example: Received signal level (RSL)-56.7 dBmCalculate →
- MikroTik BurstMikroTik queue burst duration from burst-limit, burst-threshold and burst-time, with value checks.Example: Longest burst6.4 sCalculate →
- MikroTik Queue Tree & QoSShare a parent's bandwidth across traffic classes with priority, limit-at, max-limit and the PCQ share per user.Example: All classes' limit-at in total85 MbpsCalculate →
- Wi-Fi Access PointsAPs needed from area and range (hexagonal cells) and devices per AP, plus the total PoE power.Example: Access points needed5Calculate →
Server & Storage · 11
- RAIDUsable RAID 0, 1, 5, 6, 10, 50 and 60 capacity in TB and TiB, fault tolerance, write penalty and IOPS.Example: Usable capacity16 TBCalculate →
- ZFS RAIDZZFS mirror and RAIDZ1/2/3 pool capacity with the allocation overhead for your recordsize, ashift and slop space.Example: Estimated usable space28.98 TiBCalculate →
- UPS Size & Battery RuntimeUPS rating in VA and watts and the battery runtime estimated with Peukert's law.Example: Minimum UPS rating625 VACalculate →
- Server Room CoolingCooling load from IT power in BTU/h, kW and tons, and the number of AC units with N+1.Example: Cooling load16,706 BTU/hCalculate →
- SLA & UptimeDowntime an SLA allows per month and year, the SLA a downtime means, and the combined SLA of components.Example: Per month43 min 48 sCalculate →
- VM Host SizingVirtualisation hosts needed for a list of VMs by vCPU and RAM, with overcommit, reserve and N+1.Example: Hosts needed3Calculate →
- Server Power Cost (PUE)Electricity cost of servers and IT gear running 24/7, including cooling and UPS through PUE, per month and year.Example: Cost per month$210.24Calculate →
- Log & SIEM StorageLog storage from sources, EPS and event size for hot retention and a cold archive.Example: Total storage1.42 TBCalculate →
- API Capacity & RPSAverage, busy-hour and burst RPS from your users, requests in flight, CPU cores and bandwidth.Example: Requests per second at burst200 RPSCalculate →
- Linux Swap SizeSwap size from RAM, with or without hibernation, by the Red Hat Enterprise Linux and Fedora recommendation table.Example: Recommended swap4 GBCalculate →
- Chmod CalculatorConvert Linux file permissions between numbers (755) and symbols (rwxr-xr-x), with the chmod command and umask.Example: As a number755Calculate →
CCTV & Security · 5
- CCTV / NVR StorageNVR disk size from cameras, bitrate, recording hours and retention, plus the total bandwidth.Example: Disk capacity needed22.81 TBCalculate →
- CCTV Lens (Focal Length)Focal length for a scene width at a distance, or a lens's field of view and covered width.Example: Focal length needed8.95 mmCalculate →
- DORI & Pixel DensityPixels per metre from resolution, angle and distance, the IEC 62676-4 DORI level and each level's farthest distance.Example: Pixel density at this distance160 px/mCalculate →
- PoE Voltage DropVoltage reaching a camera or AP over UTP, current, cable loss and the IEEE 802.3af/at/bt limits.Example: Voltage at the device48.11 VCalculate →
- Password EntropyEntropy in bits of a random password or passphrase, time to guess and NIST SP 800-63B's minimum length.Example: Entropy71.5 bitCalculate →