RAID Calculator: RAID 5, 6, 10 Capacity & IOPS
Usable RAID 0, 1, 5, 6, 10, 50 and 60 capacity in TB and TiB, fault tolerance, write penalty and IOPS.
- Space efficiency
- 66.7%
- Raw capacity (with spares)
- 24 TB
- Disks that may fail
- 2 disks
- Write penaltydisk operations per random write
- 6
- Maximum random read IOPS
- 1,200
- IOPS at 30% writes
- 480
Every level for 6 disks × 4 TB
| Level | Usable (TB) | Efficiency (%) | May fail | Write penalty |
|---|---|---|---|---|
| RAID 0 | 24 | 100 | None: one failed disk loses all data | 1 |
| RAID 1 | 4 | 16.7 | 5 disks (all but one) | 2 |
| RAID 5 | 20 | 83.3 | 1 disk | 4 |
| RAID 6 | 16 | 66.7 | 2 disks | 6 |
| RAID 10 | 12 | 50 | 1 disk per mirror pair (up to 3 if in different pairs) | 2 |
Formula and sources
Usable: RAID 0 = N × S; RAID 1 = S; RAID 5 = (N − 1) × S; RAID 6 = (N − 2) × S; RAID 10 = N ÷ 2 × S; RAID 50 = (N − G) × S; RAID 60 = (N − 2G) × S TiB = TB × 10^12 ÷ 2^40 (≈ 0.909); hot spares add no capacity Mixed IOPS = N × IOPS per disk ÷ (read share + write share × write penalty); penalty: RAID 0 = 1, RAID 1/10 = 2, RAID 5/50 = 4, RAID 6/60 = 6
When to use the RAID
Usable space by level
RAID 5 gives up one disk to parity, RAID 6 two disks and RAID 10 half the disks to mirroring. Six 4 TB disks leave 16 TB in RAID 6 but only 12 TB in RAID 10. The table under the result compares every level at once.
TB on the label, TiB in the system
Drive makers count 1 TB as 10^12 bytes, while Windows and many NAS systems show TiB (2^40 bytes). That is why 16 TB appears as about 14.55 TiB; nothing has gone missing.
Write penalty and IOPS
Each random write in RAID 5 takes four disk operations (read data, read parity, write data, write parity), in RAID 6 six. Enter the IOPS per disk and the write share to see the array's real IOPS for a mixed workload.
RAID 50 and 60
For large arrays the disks are split into several RAID 5 or RAID 6 groups that are striped together. Fault tolerance applies per group, and a rebuild only involves one group, so it finishes sooner.
Frequently asked questions
RAID 5 or RAID 6 for large disks?
With large drives a rebuild can take hours to days, and during that time RAID 5 has no redundancy left, so many administrators choose RAID 6 or RAID 10.
Do hot spares add capacity?
No. A hot spare sits empty and is taken by the controller to rebuild as soon as a disk fails.
What about ZFS?
ZFS uses RAIDZ and mirrors with its own allocation rules. Use the ZFS calculator for RAIDZ1, RAIDZ2 or RAIDZ3 capacity including its overhead and slop reservation.
Related calculators
- ZFS RAIDZZFS mirror and RAIDZ1/2/3 pool capacity with the allocation overhead for your recordsize, ashift and slop space.Example: Estimated usable space28.98 TiBCalculate →
- UPS Size & Battery RuntimeUPS rating in VA and watts and the battery runtime estimated with Peukert's law.Example: Minimum UPS rating625 VACalculate →
- Data Transfer TimeHow long a file or backup takes at a link speed, or the speed needed to finish in time.Example: Transfer time01:14:04Calculate →